2021-03-17 (W) Gravy Shock

The more I looked at the doors, the more I disliked the one from the second bedroom. I moved it to open across the hallway from the master bedroom, and they both open to point toward the bathroom. I added standard furnishings that would come with the houseboat, like beds, a shower, and a sink built into the toilet. The parts are color-coded, but that will only be visible in this 2D draft.
Furnished upstairs

The rest of the posts for this project have been arranged by date.
First time here?

Completed projects from year 1
Completed projects from year 2
Completed projects from year 3
Completed projects from year 4
Completed projects from year 5
Completed projects from year 6
Completed projects from year 7

Disclaimer for http://24hourengineer.blogspot.com and 24HourEngineer.com

This disclaimer must be intact and whole. This disclaimer must be included if a project is distributed.

All information on this blog, or linked by this blog, is not to be taken as advice or solicitation. Anyone attempting to replicate, in whole or in part, is responsible for the outcome and procedure. Any loss of functionality, money, property, or similar, is the responsibility of those involved in the replication.

All digital communication regarding the email address 24hourengineer@gmail.com becomes the intellectual property of Brian McEvoy. Any information contained within these messages may be distributed or retained at the discretion of Brian McEvoy. Any email sent to this address, or any email account owned by  Brian McEvoy, cannot be used to claim property or assets.

Comments to the blog may be utilized or erased at the discretion of the owner. No one posting may claim property or assets based on their post.

This blog, including pictures and text, is copyright to Brian McEvoy.
2021-03-17

Comments