2022-12-20 (Tu) Gravy Shock Ness 1.3

The third round of recording Ness was the first time I got into the swing of recording. I got through a lot of material, and the quality felt good, plus working through in one session meant that the recordings should sound consistent. I may push myself during the second round to do one character per day. A single-day session would be grueling for the two mains, but the secondary characters should be alright.
Third round of recording Ness in act 1

Files on GitHub.
Interactive 3D houseboat model.

The rest of the posts for this project have been arranged by date.
First time here?

Completed projects from year 1
Completed projects from year 2
Completed projects from year 3
Completed projects from year 4
Completed projects from year 5
Completed projects from year 6
Completed projects from year 7
Completed projects from year 8

Disclaimer for http://24hourengineer.blogspot.com and 24HourEngineer.com

This disclaimer must be intact and whole. This disclaimer must be included if a project is distributed.

All information on this blog, or linked by this blog, is not to be taken as advice or solicitation. Anyone attempting to replicate, in whole or in part, is responsible for the outcome and procedure. Any loss of functionality, money, property, or similar, is the responsibility of those involved in the replication.

All digital communication regarding the email address 24hourengineer@gmail.com becomes the intellectual property of Brian McEvoy. Any information contained within these messages may be distributed or retained at the discretion of Brian McEvoy. Any email sent to this address, or any email account owned by  Brian McEvoy, cannot be used to claim property or assets.

Comments to the blog may be utilized or erased at the discretion of the owner. No one posting may claim property or assets based on their post.

This blog, including pictures and text, is copyright to Brian McEvoy.
2022-12-20

Comments